Project Profile: 2020 Mexico Utilities 45MW



Reciprocating Engine Generators45MW of Temporary Power

In the summer of 2020, the local utility Company in Mexico was looking for temporary emergency power to support the increase in demand mainly coming from the population growth and the seasonal use of A/C units. Distributed Power Solutions mobilized, installed, and commissioned 42MW of temporary power in 25 days during a global pandemic and with temperatures over 120°F. For this project, DPS delivered power @ 230 kV (providing substation transformer) with dual fuel mobile turbines.