DPS POWER GENERATION SOLUTIONS


Project Profile: 2020 Mexico Utilities 50MW



Emergency Utility Support50MW of Temporary Power

In the summer of 2020, the local utility Company in Mexico was looking for temporary emergency power to support the increase in demand mainly coming from the population growth and the seasonal use of A/C units. Distributed Power Solutions team mobilized, installed, and commissioned 50 MW of temporary power in 35 days during a global pandemic and with temperatures over 120° F. For this project, DPS delivered power @ 13.8 kV with a mix of reciprocating Power Modules and Mobile Dual Fuel Solar T60 Turbine generators with distribution gear.